Features
Waterview Tunnel Boring Machine
Assembling, turning around and disassembling the world’s 10th largest tunnel boring machine named ‘Alice’ was a challenging yet satisfying project. To complete the Waterview Tunnel within the required timeframe, we needed to make sure we got Alice to where she needed to be at the right time and without any incidents.
Wind Turbine Maintenance
Wind turbine maintenance offers a unique selection of challenges for a crane operator. With larger loads needing to be moved, New Zealand’s ever changing weather and the ability to access remote areas for the job necessary, careful project and logistical management is essential.
Building Deans Stand at AMI Stadium
Constructing Deans Stand at AMI Stadium required a considerable collection of cranes and skilled manpower. Challenges appeared each day, due to the nature of the site and the materials we needed to move.